Warkworth Booster Pump
A 90,000-litre water storage reservoir and booster pump station built to service a 600+ lot development in Warkworth. Designed and constructed by Dreenan Civil for Templeton Group.
SCOPE OF WORK
90,000L water storage reservoir construction
Water booster pump station installation and commissioning
Infrastructure integration for a 600+ lot development
A pump station serving 600+ lots has to work correctly from day one. Design, construction and commissioning had to be coordinated closely with water supply authorities and timed to enable the wider development to proceed on schedule.